Tõrva Veemõnula Water and Sauna Centre
Completed in 2021, Tõrva Veemõnula awaits guests with its 25-metre swimming pool, various saunas, swimming pools, hot tubs, relaxation area, and sun terrace.
The building design documentation was prepared by OÜ BOA and construction was performed by Ehitustrust. SeiCom produced and installed MB-SR50N HI+ aluminium façades, aluminium windows (including motorised smoke ventilation and fire-resistant windows) and aluminium doors (including fire-resistant doors) on the construction works.